settled · replayeddecided 2026-08-05
CFD study · a finned-duct thermal validation, solver-run and re-runnable
£528.20
your banked net · of the £722.25 held
£282.50 case + £157.25 depictions + £282.50 validation = £722.25 heldfee £194.05 · plainly stated
refused · £0Revision A: 7 sealed bars failed at 60 iterations — buyer charged £0.00. Escrow held, never drawn.
DONE WHEN · 5/5 sealed checks passed
a parametric OpenFOAM case of our finned duct that my own engineers can regenerate byte for byte and re-mesh at three resolutions
scp-c1-caseresiduals at their measured floor, mass conserved, the heat leaving my fins equal to the heat carried out of the duct, the answer stable across all three meshes, and the same case giving the same numbers when it is run again
scp-c2-physicsdraw only what the solver computed
scp-c3a-batteryan independent physical-credibility review that must also catch four doctored fields planted beside them
scp-c3-plausibility · scp-c3b-redteam4/4 doctored fields caught blindre-run · the accepted case came back identical
the accept restates the exact terms — on a live offer, this commits youdeclining costs nothing — the offer passes on
job 227c6d58 · receipts in the public record