SeaOtterEarn
Browse workPricingEarn

Say what you need done.

If a check fails, you pay nothing.

Money moves only on pass.

A contract writes down what done means in plain words. A machine checks every line in a live browser before any money moves.

Work for sale, work delivered

GBPQuote and settlement: GBP · No automatic currency conversionAUDBRLCADCHFDKKEURGBPINRJPYKRWMXNNOKNZDSEKSGDUSD

Live-site repair

SeaOtter × WordPress · access connected · ✓5 · ↻ · ©
  1. The original failure is kept on file — screenshot first, then the fixMethod: We click, type, and play through it ourselves, the way you wouldCurrent evidence unavailable
  2. The named page works again on a phone screen and a desktop screenMethod: We open the page ourselves and look — no one's word is taken for itCurrent evidence unavailable
  3. The form or button reaches its destination and fires its named event exactly onceMethod: We open the page ourselves and look — no one's word is taken for itCurrent evidence unavailable
  4. No new error appears in the browser console and no other page breaksMethod: We open the page ourselves and look — no one's word is taken for itCurrent evidence unavailable
  5. Backup, deploy, restore-point and access hand-back receipts come with the workMethod: We measure what was handed over against what was agreedCurrent evidence unavailable
Open the receipt
Before: buried button. After: it works.Before — the fault, reproduced and kept on fileThe repaired site passed at phone and desktop widths.fix£79 GBP

Priority work

✓4
  1. A fixture test run produces the declared outputsMethod: Sealed re-runRuns after agreement
  2. A rerun changes nothing — idempotentMethod: Sealed re-runRuns after agreement
  3. Bad input fires the error path exactly onceMethod: Sealed re-runRuns after agreement
  4. The output matches the agreed schemaMethod: Sealed re-runRuns after agreement
✓6
  1. Your named journey completes end-to-endMethod: A browser session, drivenRuns after agreement
  2. No hidden errors or failed loads left behindMethod: A browser session, drivenRuns after agreement
  3. No challenge page stands between you and visitorsMethod: A browser session, drivenRuns after agreement
  4. The before/after delta is shownMethod: A browser session, drivenRuns after agreement
  5. The deployed build starts and its integrations answerMethod: A browser session, drivenRuns after agreement
  6. A rollback point to the pre-repair build, exercisedMethod: A browser session, drivenRuns after agreement
Published inventory web app shown on its launch pageA stuck app, launched at lastYour AI-built app repaired and launched£149 GBP to start
Accepted Unreal master: the exact keyboard geometry in the finished filmThe keyboard's own product filmProduct film£753.12 GBP
SeaOtter × Unreal Engine · ✓6 · ↻ · ©
  1. Split the deterministic scene pipeline and the finished master into two priced lines on one contract.Method: Watched and judgedCurrent evidence unavailable
  2. Build the board and the exploded assembly from a scripted scene whose part layout I can recompute from source, and hand me the Movie Render Queue manifest the render itself wrote as the receipt.Method: Watched and judgedCurrent evidence unavailable
  3. The master is 1920x1080 at exactly 24 frames per second, runs between 60 and 75 seconds, and plays as one continuous camera move with no cuts.Method: Watched and judgedCurrent evidence unavailable
  4. The film must never freeze, duplicate or black out a frame after the first, and the audio mix lands at -16 LUFS integrated within 1 LU with true peak at or below -1.5 dBTP.Method: Watched and judgedCurrent evidence unavailable
  5. If the first submitted master misses a criterion, refuse it, show me the failed numbers through WIP, and run the same checks again on the revision without moving a limit.Method: Watched and judgedCurrent evidence unavailable
  6. One package recompute must prove the delivered master bytes, the render manifest and the banked refusal still bind before anything settles.Method: Watched and judgedCurrent evidence unavailable
Open the receipt
A frame from NIGHT AUDIT — the night auditor at the front desk, 2:57 in the morningA scene from one delivered episodeDrama season, priced per episode£75 GBP · 4 episodes accepted
SeaOtter · ✓6 · ↻ · ©
  1. The delivered file is a real video, at its stated size and lengthMethod: Watched and judgedCurrent evidence unavailable
  2. The picture carries soundMethod: Watched and judgedCurrent evidence unavailable
  3. No sampled frame comes back blackMethod: Watched and judgedCurrent evidence unavailable
  4. The sound sits at its loudness target without clippingMethod: Watched and judgedCurrent evidence unavailable
  5. The cuts are read off the frames themselves, not off the edit listMethod: Watched and judgedCurrent evidence unavailable
  6. The making stayed inside the spend cap it was givenMethod: Watched and judgedCurrent evidence unavailable
Open the receipt

Say it. A Superteam gets it done—checked.

Tell us what you need